Documentation / Administration

Departments & approval tiers

Set up departments, tiers, capabilities and routing rules.

The approval workflow is driven by configuration: departments, the approval tier each belongs to, what each tier may do and which departments review which kinds of submissions. This page is for administrators.

Departments#

Organization Mng → Department → Departments. Departments form a two-level hierarchy: the main grid shows top-level departments; expand a row to see and add its child departments.

FieldDescription
Department name, Abbreviated name, Department codeThe abbreviated name is used as the title of the department's approval box.
Approval tierThe tier column the department appears in (see below).
Approval tier sort orderThe order of departments within the tier (highest first).
Color codeA color to recognise the department.
Department size, Employee count, GovernmentalDescriptive information.
Default fund, Allowed funds, ObjectiveChild departments only.
Is ActiveInactive departments are no longer offered.

Row buttons:

  • Assign users to roles (person icon): add users to each department role of this department.
  • Approval labels (tag icon): rename the fields of this department's approval box (see below).
  • Edit, Clone and Delete.

Approval labels#

Each department can use its own wording on the Approvals tab, for example Legal reviewer instead of Submitter. In the Approval Labels window, enter a label for any field (assignment status, Level 1 user and date, submission status, ready date, approver, approval date, approval status, endorsement). Leave a field empty to keep the default.

Approval tiers#

Settings → Approval Tiers defines the review stages.

FieldDescription
Approval Tier NameShown as the column title on the Approvals tab.
Approval Tier SlotThe order of the tiers.
Level 1 role, Level 2 roleThe department roles that do the work and approve it in this tier.
Is submitter tierThe tier of the submitting department.
Is approval tierThe tier whose departments come from the category / transaction type rules.
Visual elementsWhich fields of the approval box this tier shows. Fields that are not shown are completed automatically, which is how Confirmation can skip the Level 1 step.
CapabilitiesWhat users of this tier may do (see below).
Post tasksWhat happens automatically after assignment, after Ready and after approval (see below).

Capabilities#

CapabilityEffect
Can edit all tabsLevel 1 and Level 2 users of the tier can edit every tab of the submission.
Can edit all tabs per departmentAs above, but only for users who are also in the submitting department's box.
Can edit approval related tabsOnly the Approvals and Activity notes tabs can be edited.
Can edit previous tierShows Enable Previous Tier to Level 2 users.
Can edit all lower tiersShows Enable All Previous Tiers to Level 2 users.
Can select meeting schedule dateApproving opens the meeting picker; the box shows the meeting and the Reschedule button.

Post tasks#

TaskEffect
Send email to level 1 user(s) if assignedSends Submission Assigned.
Send email to level 2 user(s) if finalizedSends Submission Waiting Approval when Level 1 is Ready.
Send email to next tiers level 2 user(s) if approvedSends Submission Approved to the next tier once the whole tier is approved.
Send email to creator if approvedTells the creator the submission was approved.
Create signed / un-signed submission PDFStores the memo PDF, with or without the approver's stamp as signature.
Merge submission attachmentsBuilds the merged final PDF and enables Sign document and Merge document.

Standard configuration#

TierRoles (L1 / L2)CapabilitiesAfter approval
PresubmissionSubmitter / Submission approverApproval related tabsNotify next tier
SubmissionSubmitter / Submission approverAll tabs per department, previous tierNotify next tier
ApprovalReview User / Review approverApproval related tabs, previous tierNotify next tier
ValidationReview User / Review approverAll tabs, all lower tiers, meeting dateNotify next tier
Confirmation— / Review approverAll tabs, all lower tiersSigned PDF, merge attachments, notify creator

Parameter WaitForPreviousTier (Y by default) makes each tier wait until the previous tier is complete. With N all tiers can work in parallel.

Which departments review what#

The departments of the Approval tier depend on the submission's category and transaction type. Set this on Submission Mng → Submission Category - Transaction Types:

  1. Pick a submission category on the left.
  2. Tick Associated for every transaction type allowed in that category. Only associated types are offered on the submission's Actions tab.
  3. Choose the Departments that must review this combination (or ALL).

Transaction Type - Submission Categories shows the same links from the transaction type's side. Changes apply to submissions whose department, category or transaction type is changed afterwards.

Changing the reviewers of one submission#

To add or remove a reviewing department on a single submission, open Submission Mng → Submission - Approval Departments, pick the submission on the left (the most recent unfinished submissions are listed) and tick or untick Associated for each Approval-tier department. The submission's Approvals tab updates immediately.

An unhandled error has occurred. Reload 🗙